Do you install ground mount solar systems? If you do, you probably understand that the traditional method of digging holes and pouring concrete can be a difficult task. Not to mention the extra costs associated with this process which makes it hard to be competitive. So whats the alternative? Solar pile driving systems are changing the way ground mount solar systems are installed.
In a matter of minutes, the Gayk pile driver can accurately drive posts into the ground. A typical small residential ground mount solar system can normally take days or weeks traditionally. When utilizing our pile driver those same posts can be set in place within minutes for a typical 10kw size system.
Our company can lower installation cost by up to 30 percent over traditional methods. Time equals Money and the ability to start a solar project quickly with out having to wait on concrete to settle over night can mean large savings and convenience. Lack of dirt work and concrete is another reason for cost savings with driven pile systems.
In a matter of minutes, the Gayk pile driver can accurately drive posts into the ground. A typical small residential ground mount solar system can normally take days or weeks traditionally. When utilizing our pile driver those same posts can be set in place within minutes for a typical 10kw size system.
Our company can lower installation cost by up to 30 percent over traditional methods. Time equals Money and the ability to start a solar project quickly with out having to wait on concrete to settle over night can mean large savings and convenience. Lack of dirt work and concrete is another reason for cost savings with driven pile systems.
Services
We created Solar Pile Driver to be a company that focused on doing one thing well. That is we only specialize in driving posts for ground mount solar systems with excellence! Combine that with the fact that we are quick and nimble as a company ready to drive piles anywhere. When comparing to the alternatives with Vermeer PD10s we are only 8,000lbs compared to 16,000lbs.
The core service of our company is driving solar piles utilizing a Gayk HRE4000 hydraulic ram which is a track driven Machine. This tool allows us to drive piles that are up to 16' into the ground in under three mins in most cases. We also have the Gayk HRE5000 which is capable of 20' tall piles as well.
Yes USIC has missed this before which is why we now perform a passive locate even after the official locate has been called in. Depending on system size, the system may just follow the slope of the earth depending on drop in grade and system size. If the system is a tracking system that needs to follow the slope of the earth due to pile tolerances we utilize a few different methods for keeping the rows linear.
With the simple one motion mast raise I am able to get started working right away with out assembly of the mast like the majority of the competition.
Reliability is quintessential in our industry and believe me know body likes last minute break downs, but I can tell you with all of the machines that I have owned from Gayk, our breakdowns and issues have been very far few in between, nothing yet that has shut me down, but with Gayk North America there to take care of us, I feel at ease knowing we are in good hands with knowledgeable people backing me.
Reliability is quintessential in our industry and believe me know body likes last minute break downs, but I can tell you with all of the machines that I have owned from Gayk, our breakdowns and issues have been very far few in between, nothing yet that has shut me down, but with Gayk North America there to take care of us, I feel at ease knowing we are in good hands with knowledgeable people backing me.
Reviews (8)
Jeff Vanderpool
Jan 15, 2021
Report
Super helpful to a neophyte like me! Our operator. Brady, called us several hours in advance to advise us of his schedule, and continued to update his timeline. Brady was professional, courteous, and very knowledgable about the job. James was great to schedule and communicate with too. Great company, and we are already spreading the message!
Ryan Harkins
Aug 18, 2020
Report
Stefan Booy
Jul 27, 2020
Report
John D.
Oct 26, 2019
Report
The owner (James) was friendly, very responsive to emails and accommodating with my swing shift work schedule. The installer, Jonathon, was also friendly, did a great job, and was willing to take the time to explain each step. This company is filling a void in the market for smaller installations like mine that other companies would not consider. Overall, I give them an outstanding review and would not hesitate to recommend them to others looking for solar pile driving services. By using their company, I was able to get a 31,500 watt ground mount racking system in the ground in about 2 hours, compared
Erick Rikard
Oct 16, 2019
Report
James Bartley and Solar Pile Driver LLC have been working with us for several years now. We have had the absolute best experience with them and they have been fair and flexible with us on several projects. Their pricing is reasonable, they work with us on scheduling and they maintain high levels of excellence in the field.
Professional, experienced, courteous company that I would recommend for any solar project or post driven project.
Professional, experienced, courteous company that I would recommend for any solar project or post driven project.
Shaun McClintock
Sep 04, 2019
Report
Ernie Cota
Aug 09, 2019
Report
I was doing a self installation. After a brief conversation with James, I knew this was the correct install. I made the adjustments and got the correct piles. James was able to schedule me within a week to two and his installer was extremely professional and efficient! Within just a couple of hours, they were complete and I was away building my supports! Thank you to James and Johnathan for a great experience! I highly recommend Solar Pile Driver to anyone!!
Jeff Droz
Jun 14, 2019
Report