Nevada Ready Mix
Call now
Call now
Website
Call
Nevada Ready Mix
The Foundation Las Vegas was Built Upon! Nevada Ready Mix produces every conceivable type of concrete. Browse through our project gallery photos and extended list of projects that we're proud to have been a part of over the years. Our team of experienced professionals is dedicated to providing exceptional customer service and looks forward to working with you on your next project.

Since being founded in 1960, Nevada Ready Mix has grown to become Nevada's number one concrete company. We have a large number of trucks and multiple batch plants around the Las Vegas metropolitan area. It is our philosophy that our customers are the number one priority, and we strive to provide them with the highest quality product and best service around.

Most of the hotels in Las Vegas are built with Nevada Ready Mix concrete. Along with hotels, NRM has also completed countless residential foundations, public works, golf courses, and heavy highway projects. Our resume proves that Nevada Ready Mix truly is the foundation that Las Vegas was built on.
Services
In 1960, the original Nevada Ready Mix, a Nevada Corporation, was founded as a family owned business. In 1988, the assets of the original Nevada Ready mix were sold to a newly-formed company, the current Nevada Ready Mix Corporation, a Delaware Corporation, owned by MCC Development Corporation. Nevada Ready Mix Corporation acquired the assets of Las Vegas Building Materials and the Lone Mountain Gravel Pit in 1989.
Nevada Ready Mix has supplied concrete for hundreds of thousands of residential foundations in Las Vegas, Nevada. A few of the clients we provide concrete for are: Del Webb, Marnell Corrao, M.J. Dean Construction, Isaac Construction, Perini Construction, Tutor-Saliba Construction, Penta Building Group, and Bomel Construction.
Nevada Ready Mix produces every conceivable type of concrete. From non-specified Flowable Fills to 10,000 PSI; from lightweight to white cement, we can meet your needs. Recently, our Research & Development Lab produced a mix that reached 10,000 PSI in 3 hours! Our top selling Mix Design is 10,000 PSI, which meets Clark County Building Specifications for sulfate-resistance.
The Lone Mountain Gravel Pit is the backbone of Nevada Ready Mix. This Colluvial deposit sits at the base of the Spring Mountains in Northwest Las Vegas. The limestone and dolomite mined at Lone Mountain is the best concrete aggregate available. We also produce sand and gravel for the Nevada Department of Transportation and Clark County Public Works.
Reviews (4)
Ena Langford
Ena Langford
Sep 19, 2019
Report
On the 215 this at 7:45am two Ready Mix trucks entered 215 South. One on a green light the other on a red light as we had the green light turning onto 215 south. So took our time at approx 25 mph getting on the expressway. I turned on my signal to enter the middle lane and proceeded to try and get up to speed limit. At approx 48 mph truck #391 WITHOUT a signal swerved over in front of me cutting me off and requiring anti lock brakes to keep from hitting the cement truck. Which also caused MANY vehicles behind me to also slam on brakes, some swerved to miss me at this point. This is OUT OF HAND
Garrett M.
Garrett M.
Mar 12, 2019
Report
Best quality concrete in town. always surpasses the required PSI strength they are always 5000 psi within 7 days when the plans require 5000 psi in 28 days allowing us to continue building and not wait for the strength. Other companies we have used do not get to the required strength in 7 days slowing us down.
Justin D.
Justin D.
Feb 26, 2019
Report
I will never do business with this company again. I called to order a concrete delivery 5 days prior to the day I was going to pour. I asked for a pump mix obviously because I needed to pump the concrete. Instead of mentioning that they have three different "types" of pump mix, Michelle gave me a price and assured me the concrete would be there at the time and date. When the date arrived, the pump company showed up early and we got everything set up. The concrete was supposed to show up at 10am, but when I had not heard from Nevada Ready Mix, I called to check if they were on time
C.
C.
Jul 30, 2017
Report
Got cut off by a pickup truck exiting the quarry at 215 and lone mountain.
The weird intersection on lone mountain where everyone has a stop sign they just plowed right through at 3:30pm truck number 12157