By 1916, Joseph Kissane was the primary shareholder and the company has remained in the Kissane family. Joseph Kissane, Jr., joined the company in the 1920's and was president of the company from 1935 to 1975. From incorporation through the 1950's, the M. O'Herron Company was a road builder, utility contractor, and asphalt producer.
Some notable projects included the Corliss tunnel, the Mon Warf, the stone wall along Bigelow Boulevard., and construction and paving of many roads in the City of Pittsburgh and Allegheny County. Installation of 1600' of 12" and 400' of 4" plastic natural gas main in Downtown Pittsburgh in order to provide service to the US Steel Tower.This project in the heart of Pittsburgh also included surface restoration of necessary roadways and sidewalks.
Some notable projects included the Corliss tunnel, the Mon Warf, the stone wall along Bigelow Boulevard., and construction and paving of many roads in the City of Pittsburgh and Allegheny County. Installation of 1600' of 12" and 400' of 4" plastic natural gas main in Downtown Pittsburgh in order to provide service to the US Steel Tower.This project in the heart of Pittsburgh also included surface restoration of necessary roadways and sidewalks.
Services
By 1916, Joseph Kissane was the primary shareholder and the company has remained in the Kissane family. Joseph Kissane, Jr., joined the company in the 1920's and was president of the company from 1935 to 1975. From incorporation through the 1950's, the M. O'Herron Company was a road builder, utility contractor, and asphalt producer.
Installation 1500' of 8 plastic natural gas mainline along Hanger Rd within the Pittsburgh International Airport. Replacement of steel valves and installation of a regulator station were also included within the scope of work. Install and perform all excavation for the pig launchers and receivers at the Jones Farm and Duquesne Works locations in conjunction with Power Piping Company.
Reviews (1)
Loredana Lore Martire
Jun 25, 2020
Report